Our FAT & SAT services consists of
The FAT serves as a crucial pre-shipment verification process. It ensures that the system—both hardware and configuration software—operates as expected before it leaves the vendor’s factory.
SATs range from verifying equipment arrival to validating system functionality. They ensure that the installed controlled system aligns with specifications.
The SAT validates that control and safety systems are fully operational according to functional specifications. It occurs during the startup of the processing unit.
Both FAT and SAT minimize faults during commissioning. Fixing errors during testing saves time and effort during plant startup.